Williams Creek About Page Dropdown Image

We Plan. We Build. We Maintain. WILLIAMS CREEK MANAGEMENT is committed to the principles of value-based construction and long-term maintenance of the built and natural systems within our communities.

Williams Creek Ravina Park Stream Bank Stabilization Project

From urban landscape creation to rural sediment maintenance, we design and build innovative and individualized solutions that meet regulatory requirements while enhancing our communities and rebuilding our natural world.

Williams Creek Markets Served Dropdown Image

Each of the markets we serve has a lasting impact on society. We build long-lasting relationships and high-quality solutions that are unique to clients’ projects for communities of all markets across the Midwest.

23017 Gosport Emergency Bank Stabilization

Owner: Confidential
Client: Confidential
Location: Gosport, Indiana
Year: 2022

Williams Creek Management was contracted to tackle multiple, unique and challenging emergency bank stabilizations along the White River in Gosport, Indiana. The bank stabilization projects were needed to protect a number of transmission structures from failing due to the encroaching riverbank failures. Existing river encroachments had been the result of recent flood events and had yielded several compromised structures to the point of complete failure. Not only would Williams Creek have to complete the emergency stabilizations, but crews would also be forced to implement a few different and creative access solutions in order to complete the work at hand.

The location of the first emergency bank stabilization took place on an island in the middle of the White River, making access tricky and complex to complete. Williams Creek created a temporary stone crossing utilizing large aggregate stone and revetment rip rap for transportation of material to and from the work site. Once island access was achieved, crews began to shape and stabilize the failed banks to ensure no further damage would take place to the existing transmission line structures located on the river island. The second emergency stabilization was slightly upriver and along an adjacent environmentally sensitive and protected area. Special precautions and restoration efforts were utilized at this location to protect the natural areas from any damage during the construction process.

In total, Williams Creek stabilized greater than 650 lineal feet of riverbank, utilizing over 5000 tons of stone. Upon completion of the stabilization, our team removed the temporary bridge and restored the White River flowline back to pre-construction condition. All facets of restoration throughout the work area including row crop field decompaction, site vegetation, upland prairie restoration, and permanent access route construction were completed by Williams Creek prior to project close-out.

APPLICABLE SERVICES & MARKETS

KEY PROJECTS

WE’RE BETTER TOGETHER

Become a Client

Partner with us today to change how tomorrow looks by letting us serve your project to have a lasting impact on our world.
Contact Us

Charter Your Career

Our team loves what we do and is driven by how our work makes an impact on the communities we serve.

Join Our Team
[email protected](877) 935-6609
4620 S County Road 600 E
Plainfield, IN 46168

Williams Creek Management Corporation © 2023. All Rights Reserved. Privacy Policy

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram